Al Sadd Road
The Public Works Authority (Ashghal) announced the completion of upgrading works on Al Sadd Intersection and Al Sadd and Jawaan streets in Al Sadd Area, as part of the Road Improvement Works in Various Areas of Greater Doha (Phase 9).
Eng. Ali Sami Jamal, Project Engineer at Doha City Projects Section in the Roads Projects Department at Ashghal, highlighted the importance of upgrading Al Sadd Intersection as well as Al Sadd and Jawaan Streets as they are located in a congested and highly frequented area that serve many service facilities, shops, commercial centres, and educational and health institutions.
Eng. Jamal pointed out that the Authority was keen to expedite the work progress and opened the main lanes of Al Sadd and Jawaan Streets and Al Sadd Intersection to improve traffic flow, while the rest of the works are carried out to enhance traffic safety on the roads and landscaping and beautification works.
Project works included the upgrade of Al Sadd intersection and its infrastructure utilities, in addition to upgrading the roads adjacent to this intersection such as Al Sadd Street and Jawaan Stree?t at a total length of 3.2 Km. The traffic signal at Al Sadd intersection was also upgraded, in addition to providing pedestrian and cycle lanes with a total length of 6.4 km, providing road markings and directional signs, and upgrading the street lighting system.
In addition, works involved upgrading the 4 km-long stormwater and surface water drainage network, the 1.5 km-long sewage network, and the 1.5 km-long TSE lines, in addition to providing protection for the existing power lines and telecommunications cables, and installing new asphalt layers. Beautification and landscaping works were also implemented alongside both streets and in the median to provide 53,000 square metres of green areas.
In line with Ashghal’s strategy to support local manufacturers and Qatari products and as part of "Ta'heel” initiative, 80% of the materials used in the project were procured from local resources.
The Road Improvement Works in Various Areas of Greater Doha (Phase 9) is part of the Public Works Authority’s plan to improve the efficiency of the existing road network in Doha City to cope with the national economic development and social growth requirements.?
Qatar Secures Place Among the World's Top 10 Wealthiest Nations
Hamad International Airport Witnesses Record Increase in Passenger Traffic
Saudi Arabia: Any visa holder can now perform Umrah
What are Qatar's Labour Laws on Annual Leave?
Leave a comment